Selected Projects in Brazil

Brazil 2014

Preparation of four Buoyance Support Riser (BSR) for account of Subsea7 and property of Petrobras

Provision of manpower, cranes and other equipment for the preparation of four Buoyance Support Risers (BSR), with storage management of all equipment and materials, riggers and craneage support for the installation of equipment, parts and pieces and test, for the final subsea installation of the BSRs, for account of Subsea7 and property of Petrobras.

Brazil 2013

Logistic Study and Analysis for the transport and installation of a 760 tons Reactor for Refinery REDUC

Study of the technical feasibility for the transport and installation of a 760 tons reactor to be installed in the Refinery REDUC, considering the sea cross transport, barge transport inside the bay, multi axel transport inside the refinery, handling and installation, beside bathymetric survey, topographic survey, ground resistance survey.

Brazil 2012

Logistic management of all pipes and materials for the GSNC Pipeline offshore construction

Transport, handling, storage and loading of around 80.000 tons of pipes and other materials for the supplying of the pipelay barge Polaris for the construction of the 180 km offshore pipeline GSNC for account of Subsea7 / Odebrecht and property of Petrobras.

Brazil 2010

Logistic management of rock and gravel for the riverbed stabilization of Urucu-Manaus Pipeline

Provision of river barges, tugs, cranes and loading equipment. Procurement, transport, handling, storage and loading of around 45.000 tons of rocks and gravel for the supplying of the special rock installation vessel Tertness for the stabilization of the riverbed pipeline Urucu-Manaus located in the Amazon jungle area (Brazil), for account of VanOord and property of Petrobras.

Brazil 2008

Logistic management of all pipes and materials for the Mexilhão Pipeline offshore construction

Transport, handling, storage and loading of around 135.000 tons of pipes and other materials for the supplying of the pipelay barge Acergy Piper for the construction of the 135 km offshore pipeline Mexilhão for account of Acergy and property of Petrobras.