Selected Marine Projects in Mozambique

Mozambique 2015

Helmrich & Payne Rig Move

H&P Rig move out of Mocimboa Da Praia during April 2015: Backload a total of 17,000 cbm over the beach onto barges via jettyhead. Load the rig, materials, equipment and components to project cargo vessel for transport to South America. Transport to camp and rig moving truck fleet from Mozambique directly to Comarco Supply Base, Mombasa for bonding and storage.

Mozambique 2015

Salvage & Towage

Tandem tow of tug and barge combination from Angoche, Mozambique to Richards Bay, South Africa for dry docking, using Comarco Pemba.

Mozambique 2015

Transhipment of Bulk Cargo

Mobilise two x 1,300 bhp tugs and two x 3,000 tdwt barges from Mombasa to Angoche and thereafter load bulk mineral cargo by means of conveyor belt, tow barges to Mafamede Anchorage and lay alongside bulk carriers for loading by grab at 3,000mt per day.

Mozambique 2014

Vessel Charter

Hire of tug MT Comarco Merlin to CFM for port operations in Beira, Mozambique for 3 months.

Mozambique 2014

Salvage & Towage

Salvage of m.v Aniaftis, 10,360t dwt, aground on Ilha Nejovo south of Angoche and thereafter towage to Diego Suarez, Madagascar in August 2014.

Mozambique 2014

Helmrich & Payne Rig Move

H&P Rig move into Mocimboa Da Praia during May 2014: Discharge a total of 17,700 m3 from 3 vessels over a 16 day period to cargo barges offshore Mocimboa and move to beachhead and land ashore: BBC Finesse – 6,275 m3 (2000MT) Land Drill Rig MV Speikeroog 5,206 m3 (350MT) Rig Camp BBC Jade 6,210 m3 (3953MT) Anadarko Materials.

Mozambique 2013-2014

Transhipment of Bulk Cargo

Mobilise two x 1,300 bhp tugs and two x 3,000 tdwt barges from Mombasa to Angoche and thereafter load bulk mineral cargo by means of conveyor belt, tow barges to Mafamede Anchorage and lay alongside bulk carriers for loading by grab.

Mozambique 2013

Salvage Operation

Provide 4,000 bhp Tug, and 250ft x 3,000 tdwt Barge with 200 ton crane to recover sunken seismic acquisition vessel off Mocimboa da Praia on behalf of Anadarko in 2013.

Mozambique 2013

Vessel Charter

Hire of tug MT Rhino to CFM for port operations in Nacala, Mozambique for 4 months.

Mozambique 2005-2012

Barge Transportation

Transport of coal by barge and ship from Maputo to Tanga for Tanga Cement Factory during 2005/2012.

Mozambique 2011-2012

Offshore Transhipments & Instant Port (EBOS™)

Construct temporary Beach Head and Camp at Tupuito Beach Northern Mozambique and transport by barge and ship 60,000 m3 of mining plant and equipment including oversize loads up to 110 tons x 48 metres long from America & South Africa and land across the beach at Tupuito for Rohlig Grindrod on a/c Kenmare Resources.

Mozambique 2011-2015

Offshore Support & Security

Mobilise three in number 4,000 bhp offshore support vessels and provide security platforms offshore Pemba for E.N.I. commenced 2011.

Mozambique 2010

Salvage Operation

Salvage of Floating Dock K790 aground on Ilha Lunene in 2010.

Mozambique 2009

Rig Move & Instant Port

Mobilise Tugs, Barges, Cranes, Forklifts, Trucks, Trailers and Support Equipment to Mocimboa da Praia and backload via a temporary beach head 11,000 m3 of Drilling Rig and Camp on to Ocean Going vessels for transport to Houston and Tunisia in 2009 on behalf of Helmrich & Payne for a/c Anadarko.

Mozambique 2009

Barge Transportation & Instant Port

Accept drill pipe, cement, mud and chemicals totalling 6,000 revtons at Pemba and transport by barge to Mocimboa and there offload across temporary beach head on to trucks for delivery to stacking area on a/c Anadarko in 2009.

Mozambique 2009

Rig Move & Instant Port

Mobilise Tugs, Barges, Cranes, Forklifts, Trucks, Trailers and Support Equipment to Mocimboa da Praia and offload at the anchorage from ocean carriers ex Houston and Tunisia 11,000 m3 of Drilling Rig and Camp and land ashore over a temporary beach head in 2009 on behalf of Helmrich & Payne for a/c Anadarko.

Mozambique 2009

Barge Transportation

Transport 2,000 cubic meters of seismic rolling stock from Mombasa to Beira by barge for BGP International on account of Sasol in August 2009.

Mozambique 2007

Buoy Installation

Installation of Single Point Mooring Buoy with chain groundlegs offshore Caldeira Island on a/c Kenmare Resources during 2007.

Mozambique 2005

Salvage & Towage

Salvage of 20,000 tdwt RORO vessel “Global Africa” disabled off Moma and thereafter towage to Nacala in 2005.

Mozambique 2005-2007

Offshore Transhipments & Instant Port (EBOS™)

Construct temporary Beach Head at Tupuito Beach Northern Mozambique and transport by ship and barge and land ashore 180,000 m3 of mining plant and equipment including oversize loads up to 270 tons x 44m long from Australia, South Africa, Kenya and Mozambique and land across the beach at Tupuito during 2005/2007 for Rohlig Grindrod on a/c Kenmare Resources.

Mozambique 2002

Geotechnical Offshore Works

Mobilise Jack-up drilling platform to Tupuito Beach Northern Mozambique and carry out geotechnical drilling works offshore for account Kenmare Resources in 2002.

Mozambique 2002

Barge Transportation

Transport of coal by barge from Maputo to Marromeu on the Zambezi River for Sena Sugar Factory during 2002.

Mozambique 1998

Rig Move by Barge

Barge movement of 3,850 cubic meters of drill rig and rolling stock from Assaab and Jebel Ali to Inhassoro beach, Mozambique, on account Nabors International Drilling Co. in 1998.

Mozambique 1987

Rig Move by Barge

Barge movement of 12,000 shipping tons drill rig and camp from Mocimboa de Praia, Mozambique, to Mombasa, Kenya on account Parker Drilling Company in 1987.

Mozambique 1986

Rig Move

Ship and barge movement of 15,000 shipping tons drill rig, camp and materials into Mocimboa de Praia, on account Parker Drilling Company in 1986.

Mozambique 1985

Barge Transportation

Barge movement of 5,000 shipping tons seismic rolling stock from Mocimboa de Praia, northern Mozambique to Mombasa, Kenya on account CGG in 1985.

Mozambique 1984

Remote Camp Erection

Supply and construction of advance camp at Mocimboa de Praia, Mozambique on account Esso Exploration in 1984.